SHIPPING IN PHOTOS
DRILLING EQUIPMENT SHIPPING: LOCAL and OVERSEAS
Click on the photos to enlarge
 |
Reverse Circulation and Core Drilling Rig MAC 642 on road to Hermosilo, Mexico for Globexplore Drilling S.A.
All our drill rigs can be transported using a standard 53” flatbed trailer.
|
 |
Tracked Geothermal drilling rig, model GT635, en route to Saskatchewan, Canada.
The GT635 is being loaded on a standard 53” flatbed trailer.
|
 |
GT635 (Tracked Geothermal drilling rig) en route to Saskatchewan, Canada.
The self-propelled GT635 does not require special lifting equipment and can be driven on a standard 53” flatbed trailer using a ramp.
|
 |
GT635 (Tracked Geothermal drilling rig) en route to Saskatchewan, Canada.
The powerful and compact GT635 can be transported using a standard 53” flatbed trailer.
|
 |
RC Drilling Rig ET635 being loaded |
 |
Reverse Circulation / Core Drilling Rig is being prepared for ocean freight in a 40’ Open Top container.
Desiccant product is used for humidity control, with a vapor-barrier bag protecting the rig.
|
 |
ET635 drilling rig is en route to Mongolia.
The vapor-barrier bag covers the drill rig with
desiccant product trapping the moisture underneath. |
 |
GWT635 (Geothermal drilling rig on AWD mobile) en route to Cyprus for Z & X Mechanical Installations LTD.
All our drill rigs are specially designed to fit IN GAUGE in an Open Top 40’ container, avoiding high “oversize cargo” costs. |
 |
Drilling tools to Mongolia, Mongolyn Alt (MAK) Corp.
In this 40’ container, each pallet is securely braced using HT certified wood |
 |
RC DTH Drilling tools en route Mongolia in a 40’ container, Mongolyn Alt (MAK) Corp.
Desiccant product is used for humidity control. |
 |
Geothermal Mud Drilling / Tricone Drilling Equipment en route to Cyprus for Z & X Mechanical Installations LTD.
The drill pipes are fully secured in HT certified wood cage preventing any displacement of equipment during transport. |
Core drilling package is being loaded in a 40’ standard container. |
 |
Drilling pipes are bundled together and ready for loading.
|
 |
The core pipes are loaded into an impermeable vapor-barrier bag. |
 |
The core drilling pipes are blocked and braced within the vapor-barrier lining.
|
 |
The vapor-barrier bag is sealed to protect the drill pipes from the outside moisture. |
 |
The container is locked and is ready for transport. |
 |
Numbered container seals are placed and the container is ready for a pickup. |
RC drilling tools in a 20’ container en route to Mongolia, Khet Co., Ltd. |
 |
HT certified wooden pallets and boxes containing RC drill tools are placed in a 20’ container. Moisture sensitive items are additionally protected by vapor-barrier bags.
|
 |
RC Drill Tools secured on the pallets and in the boxes are braced using HT certified wood. |
 |
The container holding the drill tools is then locked. |
 |
Numbered container seals are placed and the container is ready for a pickup. |
En route to success!