Geothermal Drilling Cost Estimate

financiaLly plan your geothermal drilling projects

You can estimate the cost of drilling based on your own fuel cost, maintanace cost, operation cost and capital cost. This will help you to financialy plan your geothermal drilling projects and predict if you investment will be a prosperous one.

Surface Drilling Cost Estimate
STEP 1
 
   
   
Production Information:
Rock Strength (MPa) 145 10 1
Hole Dept (ft) 500 250
Availability 93%
Utilization 95%
Drilling Factor 90%
Gross Penetration Rate (ft/hr) 120 250
Net Production Rate (ft/hr)
 
Fuel Cost:
Estimated Rig Operation Fuel Consumption (L/hr) 5.2 5.2 5.2
Estimated Compressor Fuel Consumption (L/hr)
Fuel Cost ($/l)
Cost x hr.
 
Operation Costs:
Operator Cost x hr.
Helper Cost x hr.
Cost x hr.
 
Maintenance Costs:
Labour Cost x hr.
Parts Cost x hr. 17.75$
Cost x hr.
 
Consumable Cost:
Estimated DTH Bit Life ft. 1200 3600 n/a
Estimated Tricone Bit Life ft.     60000
Estimated DTH Hammer Life ft. 12000 18000 n/a
Estimated Drill Pipe Life ft. 80000 90000 110000
Drill Tube 3½" x 10 feet
Bit 4¾"
Tricone Bit 5"    
DTH Hammer 4"
Bit Cost ( x foot)
DTH Hammer Cost ( x foot) n/a
Drill Steel Cost ( x foot)
Cost x foot
Cost x hr.
 
Captial Cost:
Rig Purchase Price (Estimate)
Compressor Purchase Price (Estimate)     n/a
Depriciation Period (years)
Weeks Per Year
Days Per Weeks
Scheduled Hours per Day
Scheduled Hours per Day
Residual @ Depriciation Period
Annual Interest Rate
Annual depreciation
Cost x hr.
Surface Drilling Cost Estimate
STEP 2
Geo Track 635  
Compressor 350psi 350psi  
Mud Pump     500 psi
Formation Granite Limestone Sand, Silt, Clay,
    Shale Soft Limestone
Calculation: cost per hour (Operating cost) * Hole size- 4¾" Hole size- 4¾" Hole size- 5"
 
Fuel Cost $/hr
Operator and Helper Cost $/hr
Maintenance Cost $/hr
Consumable Cost $/hr
Capital Cost $/hr
 
Operating Cost Total $/hr
 
Calculation: cost per foot (Production cost) **
 
Net Production Estimate / Operating rate ft/hr
 
Fuel Cost $/ft
Operator and Helper Cost $/ft
Maintenance Cost $/ft
Consumable Cost $/ft
Capital Cost $/ft
 
Production Cost Total $/ft
Surface Drilling Cost Estimate
STEP 3
 
   
   
Drill Pattern Information
Hole Dept (ft) 500 250
Sub Drill (ft) 0 0
Hole Size (inch) 5
 
Geological Information
Rock Strength (MPa) 10 1
Silica Content (%) 40% 10% 0%
Rock Density (tons/yd3) 2.7 1.7 1.2
 
Production Information
Availability
Utilization
Drill Factor
Hours per Year
Hours per day 10
 
Gross Production Rate (ft/hr)
 
Net Production Rate (ft/hr)
 
 
Distance drilled per hole
Drilling time per hole (hrs/hole)
Number of holes ( x day)
 
The following estimate is intended for comparitive purposes only. This estimate applies only to the equipment listed herein and is based on the best information available at the time of completion. Due to the complexity of the factors involved in performing a drill cost estimate, this document should be treated as an estimate only. Use for budgetary purposes or other financial estimations are done at the user's own risk.